Cheesecloth and mastic
Detroiter48214
Member Posts: 15
So, we've decided to have all of our asbestos insulation removed from our steam pipes, and I'm going to redo the whole thing in 1.5in fiberglass on the pipes, thermal insulation on the fittings, and a mastic cast over the whole: in short, I'm going to try the G.W. Gill approach.
Now, I know that I paint the mastic on, wrap in cheesecloth, and paint on another layer. Here's my question, though: how many layers of cheesecloth? I figure that if my pipes are 1.5 in diameter and the fiberglass is 1.5 in, then I'm looking at a 4.5 in. diameter. About 15 in. around, then. The cheesecloth I've ordered is 36 in. wide. Do you think it will be good enough if the cheesecloth goes twice around the pipe?
Thanks! I'll put up pictures when I'm done.
Now, I know that I paint the mastic on, wrap in cheesecloth, and paint on another layer. Here's my question, though: how many layers of cheesecloth? I figure that if my pipes are 1.5 in diameter and the fiberglass is 1.5 in, then I'm looking at a 4.5 in. diameter. About 15 in. around, then. The cheesecloth I've ordered is 36 in. wide. Do you think it will be good enough if the cheesecloth goes twice around the pipe?
Thanks! I'll put up pictures when I'm done.
0
Comments
-
sure can...ive gone once, sometimes two or three layers..i try for just one layer, but if im working on trying to make a bump or wrinkle less noticeable i will go more wraps..gwgillplumbingandheating.com
Serving Cleveland's eastern suburbs from Cleveland Heights down to Cuyahoga Falls.0 -
Thanks! That sounds good to me. I looked into the PVC method, but it was more costly and, to me, it seemed like it may actually be more difficult. So we'll see how it goes.0
-
So, I forgot to post these a while back after I finished the job. Thanks for your advice!
0 -
WOW! Thanks for posting that. Was it difficult? I want to try doing the same sometime soon.Two-pipe Trane vaporvacuum system; 1466 edr
Twinned, staged Slantfin TR50s piped into 4" header with Riello G400 burners; 240K lead, 200K lag Btus. Controlled by Taco Relay and Honeywell RTH6580WF0
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements