Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
boiler replacment
Flip
Member Posts: 40
can some one tell me the proper vents to replace the ones on the dry and wet returns on a vapor system with 470 sq. ft. of radiation. the vent now on the dry return says Trane #2 quick vent the one on the wet says Trane float vent 1010-1?
0
Comments
-
Measure
the length and diameter of the steam main and we can tell you what you need.All Steamed Up, Inc.
Towson, MD, USA
Steam, Vapor & Hot-Water Heating Specialists
Oil & Gas Burner Service
Consulting0 -
steam main
steam supply 40' - 2 1/2" , 75'-2"
return 15'- 3/4" , 25'- 1" , 75'- 1 1/4"
this runs the peremeter of the basement feeding rads on 1st & 2nd floor0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 919 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements