Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

Horizontal returns and drips

when a one pipe steam dry return makes down/over/down/over /down runs back to the boiler can we add the vertical drops and some of the horizontal stacking to get the A dimension for return stacking close to the boiler and water line ? , in other words if some of the horizontal near the boiler is under water can we add that with the last vertical drop to make up the dimension stacking?

Comments

  • Hap_Hazzard
    Hap_Hazzard Member Posts: 2,846
    I might be wrong, but

    my understanding is that there should be no horizontal runs between the water line and the A dimension.
    Just another DIYer | King of Prussia, PA
    1983(?) Peerless G-561-W-S | 3" drop header, CG400-1090, VXT-24
This discussion has been closed.