Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

fall

yet another boiler season is upon us time to blow the dust off the pipe wrenches get the cutting oil out and get to work

Comments

  • JStar
    JStar Member Posts: 2,752
    Mm hmm

    October 1. Greatest day of the year.
  • kcopp
    kcopp Member Posts: 4,462
    Harvest time!

    Let the craziness begin....
  • Dave in QCA
    Dave in QCA Member Posts: 1,788
    taking bids

    Yes, taking bids for a new steamer in the Quad Cities!  Hope to have it up and running by the end of October.
    Dave in Quad Cities, America
    Weil-McLain 680 with Riello 2-stage burner, December 2012. Firing rate=375MBH Low, 690MBH Hi.
    System = Early Dunham 2-pipe Vacuo-Vapor (inlet and outlet both at bottom of radiators) Traps are Dunham #2 rebuilt w. Barnes-Jones Cage Units, Dunham-Bush 1E, Mepco 1E, and Armstrong TS-2. All valves haveTunstall orifices sized at 8 oz.
    Current connected load EDR= 1,259 sq ft, Original system EDR = 2,100 sq ft Vaporstat, 13 oz cutout, 4 oz cutin - Temp. control Tekmar 279.
    http://grandviewdavenport.com
This discussion has been closed.