Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
51 Piping

Jim_108
Member Posts: 49
Should the cold water 51 piping on a new boiler instal be piped with copper or brass pipe? I have seen it both ways over the years and wonder what is correct.ThanksJim
0
Comments
-
Not Sure...
...what do you mean by a 51 ? Copper or brass for domestic line is ok ...There was an error rendering this rich post.
0 -
feeder
sorry by 51 I mean a Mcdonald Miller #51 feeder for a steam boiler.0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 56 Biomass
- 423 Carbon Monoxide Awareness
- 104 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 938 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements