Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
NYC Boiler Installations
Boiling Point
Member Posts: 9
If you are licensed to install a boiler in NYC oil/gas then you should already know about the recent changes to the Plumbing, Mechanical and Administration codes. However, you may not know of a recent change in interpretation and eventual enforcement within the mechanical code. The city "DOB" boiler inspectors after July 1, 2009 will be enforcing on first fire and test inspections, the ASME standard CSD-1 which includes on gravity steam boilers a probe, reset style low water cut-off ie; MM 750, Hydrolevel 550 and a mechanical type. This is a departure from what originally was, just a standard probe style and mechanical type.
Your perfect new installation will fail the first fire and test, if the secondary lwco is not a manual reset type.
Dave Wagner,
President,
NY Oil Heat
Service Managers Assoc.
Your perfect new installation will fail the first fire and test, if the secondary lwco is not a manual reset type.
Dave Wagner,
President,
NY Oil Heat
Service Managers Assoc.
0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements