Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Electric Boiler
Luke V.
Member Posts: 2
I am a hydronic heating contractor doing my first eletric boiler feeding in-floor heat for a garage. Customer wants 2-zones. I want to do 1 circ. pump w/2 zone valves, all same temp. I plan on using a taco zr relay panel as well. Do I need to put in a by-pass in boiler loop for it to achieve proper flow across the boiler. Boiler is a 8kw Thermolec. Also should I let the boiler control the circ. pump, or the Taco panel? The boiler manual does not mention any of this. Any advice would be great help! Thanks,
Luke
Rocky Mntn Plg & Htg, Inc.
Luke
Rocky Mntn Plg & Htg, Inc.
0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 913 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements