Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Tekmar 260
ken wickre_8
Member Posts: 8
Terminals 1&2 (Blr Demand) and 3&4 (DHW Demand) require a powered input - 24vac, 120vac or 240vac. Jumping them won't create a heat demand, but a powered input will. You can create a heat demand by jumping 5(L) to 1 and 6(N) to 2 and see if you can fire the boiler and start the pump(s). If this works, then you will have check your power source from your heat demand. See the following link if you don't have a copy of the applications brochure from temmar http://www.tekmarcontrols.com/literature/acrobat/a260.pdf
0
Comments
-
Tekmar 260 Control
I am having a problem on a 260 control; When I test the powered imputs I can fire the boiler, get the pumps to work; When I test my boiler demand terminal I have no voltage and if I jump the terminal the boiler won't fire; same with DHW demand;
Any help would be appreciated.
Thanks0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 915 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements