Just the beggining

jim burke
Member Posts: 26
Just started this job yesterday we had to get pex down in one day so they could pour concrete today .
James and I tied down 2000. ft. of 1/2" pex on 8 " center's in record time each loop is 200 FT. long & there is 10 loops .
This house will have all radiant with mod / con heating plant with indirect .Next week we will start heating units and indirect install to stay ahead of schedule . Driveway has snow melt ready and is also being used in summer to supplement hot water load using solar gain thru asphalt driveway .
James and I tied down 2000. ft. of 1/2" pex on 8 " center's in record time each loop is 200 FT. long & there is 10 loops .
This house will have all radiant with mod / con heating plant with indirect .Next week we will start heating units and indirect install to stay ahead of schedule . Driveway has snow melt ready and is also being used in summer to supplement hot water load using solar gain thru asphalt driveway .
0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 56 Biomass
- 423 Carbon Monoxide Awareness
- 104 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 159 Indoor-Air Quality
- 3.6K Oil Heating
- 69 Pipe Deterioration
- 941 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements