Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Buderus GB142 Multiple boiler installs

Chris_12
Member Posts: 9
Putting in 3 142/35s to satisfy loads as follows...
212kBtu heating (radiant)
190kBtu snowmelt - Low Priority
150kBtu indoor pool heat
119 gallon IDHW - High Priority
80 gallon IDHW - High Priority
Plan to use tekmar 264 boiler sequencer inputing to an outdoor reset control to control two mix temps (wood and slab)
Going to preheat incoming IDHW feeds with the boiler return via tube exchangers to depress the return temperature. Does anyone have a calculator or table for figuring the the tube exchanger sizing?
Looking for any experienced input as to pitfalls of sequencing these. They were chosen over the MZ and the W-M.
212kBtu heating (radiant)
190kBtu snowmelt - Low Priority
150kBtu indoor pool heat
119 gallon IDHW - High Priority
80 gallon IDHW - High Priority
Plan to use tekmar 264 boiler sequencer inputing to an outdoor reset control to control two mix temps (wood and slab)
Going to preheat incoming IDHW feeds with the boiler return via tube exchangers to depress the return temperature. Does anyone have a calculator or table for figuring the the tube exchanger sizing?
Looking for any experienced input as to pitfalls of sequencing these. They were chosen over the MZ and the W-M.
0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 56 Biomass
- 423 Carbon Monoxide Awareness
- 104 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 938 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements