Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

puge station

hr
hr Member Posts: 6,106
you can flow backwards through the zone to purge at the supply header. Some zone valves and telestat type valves do not allow flow backwards. Also some circs now come with flow checks built in, and only allow flow in one direction.

Why not go with the flow and have the stop and purge cock at the return side?

hot rod

<A HREF="http://www.heatinghelp.com/getListed.cfm?id=144&Step=30">To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"</A>

Comments

  • rick_31
    rick_31 Member Posts: 10


    Anybody have a diagram for a puge station on the supply header. Iusually install on return .Is supply better.
This discussion has been closed.