Buderus job B.N.
Bill Nye_2
Member Posts: 538
First time I ever stacked a Buderus. I've done about 5 Viessmanns. First time I used the grundfos 3 speeds with the check valve.
It is a 79 gallon tank, LT300, they did not want to run out of hot water. 400 gallon Roth tank.
The wooden stick under the return header is temporary[ see the lose hanger?] I ran out of threaded rod, 10' 6" ceilings.
This was a early '80's solar home, 6 thousand square feet with an 8 car garage. The beam over the boiler came from an old factory and was rotted and needed to be replaced. Hence the two lally columns in front of boiler. This held the job up two months. My partner Mark and I stayed until midnight last week to get it going.
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=351&Step=30">To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"</A>
It is a 79 gallon tank, LT300, they did not want to run out of hot water. 400 gallon Roth tank.
The wooden stick under the return header is temporary[ see the lose hanger?] I ran out of threaded rod, 10' 6" ceilings.
This was a early '80's solar home, 6 thousand square feet with an 8 car garage. The beam over the boiler came from an old factory and was rotted and needed to be replaced. Hence the two lally columns in front of boiler. This held the job up two months. My partner Mark and I stayed until midnight last week to get it going.
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=351&Step=30">To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"</A>
0
Comments
-
First time
First time I ever stacked a Buderus. I've done about 5 Viessmanns. First time I used the grundfos 3 speeds with the check valve.
It is a 79 gallon tank, LT300, they did not want to run out of hot water. 400 gallon Roth tank.
The wooden stick under the return header is temporary[ see the lose hanger?] I ran out of threaded rod, 10' 6" ceilings.
This was a early '80's solar home, 6 thousand square feet with an 8 car garage. The beam over the boiler came from an old factory and was rotted and needed to be replaced. Hence the two lally columns in front of boiler. This held the job up two months. My partner Mark and I stayed until midnight last week to get it going.
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements