Ha Dan Primary Secondary Problem

Mitch_6
Mitch_6 Member Posts: 549
Show Two boilers tied into the Primary loop one after another. In a Two boiler install with a Tekchmar staging control this seems to work OK since not all the time both boilers fire.

I have a case were four boilers are tied in like this and the last boiler receives so much temperature from the prior three on peek demand that it barely fires.

It seems tying all the feeds together then all the returns together then going in the the primary is a better way.

Just my observation.

Mitch S.