I am quoting a large building with radiant floor heating system.
Can I put (2) GB142 (with manifolds) in "series" with some type of staging control?
Thanks!
71Gibby
Can I put (2) GB142 (with manifolds) in "series" with some type of staging control?
Thanks!
71Gibby
0
Comments
-
yes
But, I don't think you can do it in series, rather parallel, and supply and return piping may need to be increased off pre-piped manifolds.
The sizes and piping configurations are listed in their applications manual.
See if you can get a copy of that.0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements