add a loopl
Options
neil_7
Member Posts: 2
Wanting to tie in a floor loop 200' in basement to current valveless manifold panel w/out circulator, myson radiator sys. at 140 operating temp.
Adding a Tico injection for a single in flor loop Close tees at primary loop, obviously gate valve on return.
First question, do I have an 18" drop in my supply lijne befor the Tico or after.
Second question if I heat the subfloor above at 1st floor bath(3/4" fur, 1" thick mortar bed, ceramic on top) and installAl transmission plates to the existing subfloor what temp. should I run the H2O at to penatrate the 3/4" fur subfloor and mazamise the radient effect thruoghout the mortar bed
Adding a Tico injection for a single in flor loop Close tees at primary loop, obviously gate valve on return.
First question, do I have an 18" drop in my supply lijne befor the Tico or after.
Second question if I heat the subfloor above at 1st floor bath(3/4" fur, 1" thick mortar bed, ceramic on top) and installAl transmission plates to the existing subfloor what temp. should I run the H2O at to penatrate the 3/4" fur subfloor and mazamise the radient effect thruoghout the mortar bed
0
This discussion has been closed.
Categories
- All Categories
- 87.4K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 429 Carbon Monoxide Awareness
- 120 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.8K Gas Heating
- 115 Geothermal
- 167 Indoor-Air Quality
- 3.7K Oil Heating
- 77 Pipe Deterioration
- 1K Plumbing
- 6.5K Radiant Heating
- 395 Solar
- 15.7K Strictly Steam
- 3.4K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements