piping questions
Bob Bona_4
Member Posts: 2,083
Have a couple of questions for you guys..
proposing 2 TT Solo 175's. Using LLH to decouple. Two TT TR120's.
in addition to the high temp TR zone there will be 7 more high temp zones piped secondary.
Here is the question: There is a single temp requirement (about 110+) required for 22 zones of Warmboard (some micro). These zones are going to have telestats and various manifolds scattered around the house. How should I handle this? How much flow can one get out of Wirsbo's Propanels? What tekmar/Promix control would be appropriate to stage the two boilers, do domestic, do 7 more zones of high temp, and do one low temp?
TIA!
proposing 2 TT Solo 175's. Using LLH to decouple. Two TT TR120's.
in addition to the high temp TR zone there will be 7 more high temp zones piped secondary.
Here is the question: There is a single temp requirement (about 110+) required for 22 zones of Warmboard (some micro). These zones are going to have telestats and various manifolds scattered around the house. How should I handle this? How much flow can one get out of Wirsbo's Propanels? What tekmar/Promix control would be appropriate to stage the two boilers, do domestic, do 7 more zones of high temp, and do one low temp?
TIA!
0
This discussion has been closed.
Categories
- All Categories
- 86K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 420 Carbon Monoxide Awareness
- 80 Chimneys & Flues
- 1.9K Domestic Hot Water
- 5.3K Gas Heating
- 95 Geothermal
- 154 Indoor-Air Quality
- 3.3K Oil Heating
- 61 Pipe Deterioration
- 888 Plumbing
- 5.9K Radiant Heating
- 378 Solar
- 14.7K Strictly Steam
- 3.2K Thermostats and Controls
- 52 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements