Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
piping questions

Bob Bona_4
Member Posts: 2,080
Have a couple of questions for you guys..
proposing 2 TT Solo 175's. Using LLH to decouple. Two TT TR120's.
in addition to the high temp TR zone there will be 7 more high temp zones piped secondary.
Here is the question: There is a single temp requirement (about 110+) required for 22 zones of Warmboard (some micro). These zones are going to have telestats and various manifolds scattered around the house. How should I handle this? How much flow can one get out of Wirsbo's Propanels? What tekmar/Promix control would be appropriate to stage the two boilers, do domestic, do 7 more zones of high temp, and do one low temp?
TIA!
proposing 2 TT Solo 175's. Using LLH to decouple. Two TT TR120's.
in addition to the high temp TR zone there will be 7 more high temp zones piped secondary.
Here is the question: There is a single temp requirement (about 110+) required for 22 zones of Warmboard (some micro). These zones are going to have telestats and various manifolds scattered around the house. How should I handle this? How much flow can one get out of Wirsbo's Propanels? What tekmar/Promix control would be appropriate to stage the two boilers, do domestic, do 7 more zones of high temp, and do one low temp?
TIA!
0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 57 Biomass
- 423 Carbon Monoxide Awareness
- 104 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 939 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements