Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
new install
Options
lchmb
Member Posts: 2,997
Comments
-
-
How long did new boiler take? And how many guys?0
-
I would be willing to bet they were having problems w/ ghost flow on those zones so they forced the flow to stop w/ the zone valves.wcs5050 said:And the GV was so high tech for its time. What's with each zone having a pump and zone valve. Never understood that logic.
0 -
-
-
-
very nice install, the TT boilers are a really good product0
-
Nice clean work
the man takes pride in his work
looks good0 -
-
-
Black and yellow is EOL.0
-
-
I figured that was happening once I saw the info on the new VT pumps.0
-
The VT-2218 still has a small dime size decal with a bumblebee right next to the nice large screen...LANGAN'S PLUMBING & HEATING LLC
Considerate People, Considerate Service, Consider It Done!
732-751-1560
email: langansph@yahoo.com
www.langansplumbing.com0
Categories
- All Categories
- 85.7K THE MAIN WALL
- 3K A-C, Heat Pumps & Refrigeration
- 49 Biomass
- 418 Carbon Monoxide Awareness
- 71 Chimneys & Flues
- 1.9K Domestic Hot Water
- 5.2K Gas Heating
- 92 Geothermal
- 149 Indoor-Air Quality
- 3.2K Oil Heating
- 59 Pipe Deterioration
- 847 Plumbing
- 5.8K Radiant Heating
- 371 Solar
- 14.5K Strictly Steam
- 3.2K Thermostats and Controls
- 50 Water Quality
- 38 Industry Classes
- 47 Job Opportunities
- 15 Recall Announcements