Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Pitch of Wet Return on One Pipe System and Flushing Return Line?
Steamhead (in transit)
Member Posts: 6,688
does not need pitch to operate. It should be pitched for drainage and flushing. Go ahead and flush it out now, and again when you start seeing dirty boiler water.
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=367&Step=30">To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"</A>
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=367&Step=30">To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"</A>
0
Comments
-
Pitching of Wet Return and Flushing of Wet Return?
Thanks to everyone who has always posted on this site. Your expertise is always welcome.
Question # 1: My 1+1/2" wet return practically levels out after making a turn and then continues pitching back towards the boiler on a one pipe system.
I am concerned that this is were sediment and corrision will occur in the return because the pitch levels out here. Should I be concerned ? Should the pitch 1/4 per foot continue throughout the return or not? Any thoughts ?
Question # 2: If I do have to correct this pitch, and do so, should the wet return be flushed say now, during the summer when the system is down?
And is flushing the wet return a good thing to do every year, every five years, Never ? Any thoughts ?
Thanks again to Dan H. and everyone who participates on The Wall.
bobbyd
0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements